GCE druva MM90 STANDBY Instrucciones De Uso página 6

Sistema central de suministro de gas
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

6. INSTALLATION
It is necessary that an installer of the
product is trained and has an appropriate
licence according to national standards.
It is outside the scope of these operating
instructions to give detailed guidance on
installations.
EN
The installation must conform to the
standard MEDICAL GAS PIPELINE SYS-
TEMS EN ISO 7396-1 as amended. All
tests according this standard have to be
fulfilled.
When working with medical gases it is es-
sential that no oil or grease come into con-
tact with the gas. This means that hands,
tools and work clothes be free from oil or
grease before any work is undertaken.
Components used for service must be
gas compatible. For oxygen service must
also be degreased and although they will
Fig. 2
reach you in this condition care must be
taken during storage and handling.
6.1. WALL FIXING
Positioning of the manifold consult with gas supplier and designer. Mount the manifold at the
height to suit either cylinders or cylinder bundles.
The holes to use for mounting the manifold are shown in Fig. 2.
Be aware that only upper screw is holding the entire weight of the manifold. Size of used
screws shall conform to total load.
6.2. FITTING OUTLET CONNECTION
Solder diameter 15 mm pipe.
6.3. FITTING SAFETY VALVE AND PURGE OUTLETS
Solder diameter 10 mm pipes. The pipes from safety valve and purge can (by use of a T-cou-
pling) be soldered together and have a common outlet outside the building.
6.4. FITTING TAILPIPES / HIGH PRESSURE HOSES / COLLECTING
BRANCH
Screw tailpipe / high pressure hose from cylinders or cylinder bundle / collecting branch onto
the inlet connection on the manifold. Ensure that the shut-off valve (B) and the purge valve (C)
are in the closed position.
Open one cylinder from bank SLOWLY.
Check connection between tailpipe and inlet connection for leaks using a 0.5% teepol / water
solution.
If no leaks open remaining cylinders slowly from that bank.
Note: if a leak occurs between tailpipe/high pressure hose/collecting branch and inlet con-
nection check to see if sealing washer is fitted correctly or missing.
6.5. FITTING TO SOURCE OF ELECTRICITY AND TO ALARM SYSTEM
Any work with electric wiring must be carried out by a trained person with an appropriate
licence according to national standards.
6/48
Tabla de contenido
loading

Tabla de contenido