Maintenance
In case of fuse blown: disconnect it from mains then replace the fuse with
spare fuse of 2A provided in the in built cartridge of mains inlet.
*Fuse not be charged by a student operator.
Verification after fuse replacement
Connect the mains to the apparatus
Switch on the rocker switch mounted on front panel.
In built indicator of rocker switch will glow on and apparatus will start
working
In case of belt replacement:
Remove the hollow metal globe
Disassemble the upper roller tightened with butterfly nuts and pull out the
belt.
Manual de instrucciones- Instruction manual
QLL014
Rotate the cylindrical acrylic pipe to the clockwise direction, as indicated
on the upper panel of the power supply unit.
Pull out the belt from lower roller as well
Insert the new belt over the lower roller and assemble cylindrical acrylic
pipe on the upper panel of power supply unit.
Now, insert another end of new belt over the upper roller and tightened
that upper roller with the help of butterfly nuts as previous.
Verification after the belt replacement
Place the hollow metal globe
Connect the mains to the apparatus
Switch on the rocker switch mounted on front panel.
Belt will start moving on the lower and upper rollers.
Versión-Version 1/2017
9