YAMIT AF-9800 Serie Manual De Servicio página 26

Tabla de contenido
AF9800
D.
INSTALLATION
General – The control unit & Filter junction box are supplied with 5 meters cables
in flexible conduit.
The user must connect only the line supply cable through a PG-13.5 mm conduit.
Requirements : 5 x 1-1.5mm supply cable.
1. Connect the line supply cable (5 x 1-1.5mm) to the control unit terminals :
IMPORTANT ! 1x2-4amp protectors MUST protect line supply.
TB GND - GND Wire.
TB1 - N Natural wire.
TB2 - L1 Line phase supply.
TB3 - L2 Line phase supply.
TB4 - L3 Line phase supply.
Control board
TB5 - Motor GND. wire.
TB6 - Motor U phase wire.
TB7 - Motor V phase wire.
TB8 - Motor W phase wire.
TB9 – SV flushing solenoid common.
TB10 – SV flushing solenoid , live
TB11 – DP switches common
TB12 – DP switch live
2. Motor synchronization
Motor synchronization must be carried out as follows :
Switch the MAIN switch to START position and Verify that ON (L1) indicator lit.
Press push button FLUSH momentarily and Verify that FLUSH indicator lights and
the motor activated simultaneously.
Check the motor axis rotation (Which drives the filter dirt collector) ,
The rotation must be at the same arrow label direction.
If not , switch the MAIN switch to STOP position , and exchange between
two of the Motor phase and check again.(e.g. Between motor connection to
TB 6><7 or TB 7><8 in the control board or in the filter junction box.)
Filter Junction box
(1)
(2)
(3)
(4)
TB5
TB6
TB7
TB8
TB9
TB10
TB11
TB12