Weka 816.3001.00.00 Instrucciones De Montaje, De Manejo Y De Mantenimiento página 9

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 18
ASSEMBLY TERMS
If you decide to obtain help during assembly and call a weka assembly team for this purpose,
weka Holzbau GmbH will assist as follows:
Assembly means putting together (installation) of the individual parts supplied. It does not include
treating them with a wood protection agent or delivery and assembly of accessories and accessory
parts.
Electrical connections are not included in the assembly services.
The items to be assembled must be located at the installation site/location/base area.
Transportation of the item or components beyond a distance of 15 m or to another
storey is not included in the quoted assembly price.
The substrate must be stable, horizontal and level.
In the event of doubt, reference should be made to DIN 18202 "Level tolerances in building
construction", tab. 3, row 3, with a
maximum height difference at the furthest points of approx. 10 to 11 mm.
All preparatory work must have been carried out in accordance with the technical regulations before
assembly begins.
The substrates/floors/foundations constructed or selected by you must be suitable for the assembly.
TOOLS
You should have the following tools on hand before beginning assembly.
(not included)
Spirit level
tape measure
drill
electric screwdriver
spanner
Techn. Änderungen vorbehalten!
Alle Maßangaben sind ca. Maße.
 Copyright HRB 3662
Tabla de contenido
loading

Productos relacionados para Weka 816.3001.00.00

Este manual también es adecuado para:

816.3001.10.00

Tabla de contenido