Installation And Putting Into Operation; Installation And Configuration; Connecting To Power Supply - Mettler Toledo Fieldbus Manual De Usuario

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 11
1 Introduction
The METTLER TOLEDO Fieldbus-Modules allow to connect METTLER TOLEDO weigh modules to an industrial
Fieldbus network and make it possible to control the weighing sensor with a PLC master. For each weighing
sensor is a separate Fieldbus-Module required.
The following Fieldbus-Modules are currently available:
Fieldbus module
METTLER TOLEDO Profibus-Module
METTLER TOLEDO DeviceNet-Module
METTLER TOLEDO EtherNet/IP-Module
METTLER TOLEDO ProfiNet IO-Module
METTLER TOLEDO CC-Link Module

2 Installation and Putting into Operation

2.1 Installation and configuration

To install and configure the Fieldbus-Module proceed as follows:
1 Configure the weighing sensor.
2 Mount the DIN-Rail.
3 Connect the Fieldbus-Module to a PC for initial configuration.
4 Connect the Fieldbus-Module to the weighing sensor.
5 Connect the Fieldbus-Module to a power supply.
6 Configure the Fieldbus-Module and activate the changes in the Fieldbus-Module.
7 Connect the Fieldbus-Module to the Network and check the LED indications.
For further details on these instruction steps, see Operating Instructions.
Documentation Fieldbus-Module

2.2 Connecting to power supply

The power supply connector is located at the bottom of the Fieldbus-Module.
Pin
Description
1
+ 24V DC +/- 10%, 280mA max.
2
GND
An appropriate connector with screw terminals is included in the delivery (connector type MSTB 2.5/2-
ST-5.08). The appropriate cable diameter ranges from 0.2 mm
Fieldbus-Modules
u
www.mt.com/ind-APW-fieldbus-support
Fieldbus
1
2
2
2
to 2.5 mm
(AWG 24 to AWG 12).
Part number
42102809
42102810
42102860
42102859
30038775
Power connector
2 -
+ 1
3
Tabla de contenido
loading

Tabla de contenido