8.
INSTALLATION
8.1.
PRELIMINARY PROCEDURES
•
Make
sure
the
various
components are all intact.
•
Make
sure
the
various
components are all intact.
•
Move the packaged section as near
as possible to the installation site.
•
Do not stand equipment or weights on
top of the packaged unit.
8.2.
CHOOSING AN
INSTALLATION SITE
•
On a fl at surface, the unit can
support the weight of the product
and its contents.
•
Do not place the unit in areas
where fl ammable gases or acidic,
aggressive and corrosive substances
are present, as these could damage
the various components beyond
repair.
•
If the unit is ducted, do not exceed
a total length of 10 metres.
8.3.
HYDRAULIC CONNECTIONS
min. 0,5 m
min. 0.5 m
min. 0.5 m
min. 0,5 m
min. 0,3 m
min. 0.3 m
mi n . 1.2 m
min. 1,2 m
min. 0.3 m
min. 0,3 m
Perform connection to the system
piping, so that the pipes:
•
Are not resting their entire weight on
the unit.
unit
•
Allow maintenance procedures to
be carried out on the unit.
unit
•
Allow access and removal of any
accessories installed.
Make sure the tank can be emptied
without being de-pressurised; use a
vacuum breaker valve if necessary. The
operating pressure of the boilers is 6 bar.
For
correct
commissioning,
recommend:
•
The installation of a safety valve and
a suitably-sized expansion tank.
•
Connection of the sacrifi cial anode
(supplied) to the metal bulk.
•
Testing the hardness of the mains
water (the warranty will not be valid
for hardness levels under 15°F and
over 40°F).
1 Rolling shutter
2 Pressure reducer
3 Control valve
4 Non-return valve
5 Drain valve
we
power
supply
hot water
ry**
heating delive
circulation (if necessary)
**
heating return
alternative energy delivery
alternative energy
*
return
cold water (connection
compliant with DIN 1988)
6
Membrane safety valve
7
Circulation pump
8
Drain
*
PWW and PEP models only
* * PEP models only
*
condensate
drain
45
SWP_5287500_00