STEP 19
Folding the MoJack EZ
• Pull locking pin out to unlock.
• Raise the Tower out of the Base by pulling up on the
Grip Handle and then lower the Tower.
• The tower will be securely locked in place when the
locking pin retracts.
THE MOJACK EZ IS NOW READY FOR STORAGE OR TRANSPORT.
STEP 20
Raising the MoJack EZ with a power drill
• The MoJack EZ can be raised or lowered by using a
variable speed corded drill (7 amp minimum) or variable
speed cordless drill (18V minimum).
• The drill will require a 3/8" square driver (not provided).
• Remove Crank Handle by taking out the nut and bolt
which reveals the 3/8" Square Receiver.
• Firmly insert the 3/8" driver in the Square Receiver.
Rotate the drill forward (clockwise) to raise
the Lift Arm and rotate the drill in reverse
(counterclockwise) to lower the Lift Arm.
• Carrier Locking Pin must be pulled out when
lowering until it clears the bottom Safety Hole.
Operator must have a firm grip on the drill before
raising or lowering the Lift Arm.
• Follow all other operating instructions while using the
drill attachment.
• Replace the Crank Handle for future use.
MoJack EZ Lift
Operating Instructions
(optional)
Receiver
Thread
16
Lift Tower
out of Base
3/8"
Square
Driver
Square
Screw
Tower Locking
Pin
(unlocked position)
Tower Locking
Pin
(locked position)