dirna Bergstrom bycool green line compact Instrucciones De Montaje página 29

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

COMPACT
Pass the other end of the power cable to the
20
front of the fuse box, securing to the original
wires with flanges.
Take down the wire connections cover on
21
the front and, from inside the cabin, pass the
brown wire to the earth point, secure with
flanges and connect with M6 100 nut, Ø6 flat
washer and Ø6 grower washer.
Run the A and M power cables through the
22
corrugated tube located at the bottom of the
passenger side to the end of the corrugated
tube in the top right glove compartment.
20
M wire fastening
point (- connection
point)
22
22
29
Air conditioning for vehicles
21
EN
Tabla de contenido
loading

Tabla de contenido