TO ASSEMBLE
THE HANDLE
AND
CRANK
ASSEMBLY
1. Cut tie holding shift rod to lower
handle and move shifter to the first
forward gear.
2. Cut and discard the plastic tie that
secures the crank assembly.
3. Loosen, but do not remove, the
screws, flatwashers, Iockwashers,
and hex nuts in the upper holes of
the lower handle.
See Figure 3.
4. Remove the fasteners and the eye-
bolt from the lower holes of the low-
er handle See Figure 5.
Right Hand Side
Of Upper Handle%
Loosen,
but do not
remove
11/32"
EF{
Flatwasher
5/16" Hex Nut'_
5/16"
Screw
5/16" Split
Lockwasher
Figure 3
NOTE;
Make sure the cables
are
not caught
between
the upper and
lower handle.
5.
Raise the upper handle
into operat-
ing position.
NOTE:
If the cables
have become
dis-
connected
form the drive levers,
rein-
stall the cables
as shown
in Figure 4.
Lever
"Z" Fitting
X
6. Install the fasteners that were re-
moved in step 4. DO NOT tighten
until all bolts are in place.
Eye Bolt
3/8" Nylon
J
Locknut
\
Flatwasher
Figure 5
7.
Attach
the crank
rod to the universal
joint assembly
with the hair pin. See
Figure 6.
8.
Tighten
nut on eye bolt,
Make sure
eye bolt
is properly
aligned
and the
crank
can freely
rotate.
9.
Tighten
all handle
and panel bolts.
Universal Joint Asser
Crank Rod
Figure 6
Control
Cable
Figure
4
F-051005L
9