GF JRG Uni Controller Instrucciones De Montaje página 27

Hycleen automation system
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 30
EN
Mounting the powerbox
With cable lengths longer than 300 m,
a powerbox (14) must be connected
14
between two connecting cables.
IN OUT
Note:
When cabling the powerbox, observe the IN and OUT marks. See the installation
instructions for the powerbox.
Note:
Deficient assembly can cause malfunctions!
If the knurled screw is not tightened correctly, the cable plug can work loose over
time. This can lead to a loss of functionality! Make sure that all knurled screws of the
connecting cable are tightened! Never unplug live cables.
Assembling the Uni Controller
To fasten the Uni Controller to a pipe
7
or to pipe isolation, bend the
2 slats (7) slightly along the line.
Position the Uni Controller on the pipe
or the isolation and fasten it using cable ties.
Wall mounting
Drill wall with a 6mm diameter drill
according to the drilling pattern.
Insert dowel,
position the
Uni Controller
and then insert
the screws.
27
Tabla de contenido
loading

Este manual también es adecuado para:

9902.000

Tabla de contenido