Step 4, Secure Wiring; Step 5, Size And Install Ductwork - GE Monogram ZV850 Instrucciones De Instalación

Ocultar thumbs Ver también para Monogram ZV850:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALL LOWER SUPPORT FRAME
frame and loosely secure with 8 screws and
washers (4 on the front and 4 on the back sides).
Adjust the lower support frame up or down
to the desired height above the countertop.
Tighten screws.
IMPORTANT: Again, check to be sure the support is
level in both directions. There is no way to level the
hood after the hood is secured to the frame.
SECURE WIRING
and pull a length to reach the hood junction box.
Front Side
Support
Frames
prevent damage during installation and service.
Installation Instructions
INSTALLATION – RECIRCULATING
Ceiling
Tape
House
Wiring
SIZE AND INSTALL DUCTWORK
to bottom of support frame.
– Subtract 3/4" for hood insertion into the bottom
of the frame.
" dia. duct to the required length.
NOTE: The bottom end of the duct must be flared
slightly, to facilitate installation of the hood.
duct connector. Push duct up until it is 3/4" from
the bottom of the support frame flange. See
illustration.
the connection is secured in place.
18
13-5/8 "
Tabla de contenido
loading

Este manual también es adecuado para:

Monogram zv855

Tabla de contenido