Step 1, Mount Template; Step 2, Install Upper Support Frame - GE Monogram ZV850 Instrucciones De Instalación

Ocultar thumbs Ver también para Monogram ZV850:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

MOUNT TEMPLATE
tape in place.
– Be sure the template is oriented correctly, with the
front of the hood.
Use a plumb to be sure the mounting
holes will provide parallel alignment
with the countertop below.
locations. Use a 5/32" bit and drill
approximately 1-1/2" deep.
1" dia.
Installation Instructions
INSTALLATION – RECIRCULATING
Front of Hood
INSTALL AIR DEFLECTOR AND
UPPER SUPPORT FRAME
The duct connector is shipped inside the deflector.
Snap the plastic connector out of
the deflector and remove. Turn it
over. From the bottom, snap the
connector over the opening.
Slide the assembled deflector into
the upper support frame and secure
with 4 small screws.
the ceiling joists and/or cross framing
with the 4 screws provided. For maximum rigidity
and strength, the screws must be driven into the center
of the joists and/or cross framing.
and horizontally.
17
NOTE: Be sure plastic
connector is installed
on the bottom of the
deflector as shown.
Tabla de contenido
loading

Este manual también es adecuado para:

Monogram zv855

Tabla de contenido