Manual Manoeuvre Or Release; Testing; Maintenance; Disposal - Moby 5000 Serie Manual De Uso

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 49

3) Manual manoeuvre or release

Manual manoeuvre for models:
MB4005 - MB4006 - MB4015 - MB4024 - MB5015
MB5016 - MB5024
The gate must be moved manually (fig. 3) in case of a power failure
or a system fault.
Manual movement allows the gear motor to move freely only if this is
correctly mounted and original accessories have been used.

4) Testing

The whole system must be tested by qualified and expert staff who
must perform the tests required, according to the relative risk.
To test MOBY, proceed as follows:
• close the gate;
• disconnect the power supply from the control unit;
• release the gear motor;
• completely open the gate by hand;
• check that the gate does not stick when moving;
• check that when the gate is stopped at any point it remains
motionless;
• check that the safety system and mechanical stops are in good
condition;

5) Maintenance

MOBY does not require any special maintenance, but a scheduled
control at least every six months will ensure the gear motor lasts
longer and that the system works correctly and safely.

5.1) Disposal

MOBY comprises various types of materials which must be disposed
of in compliance with the laws of the country of installation. There are
no particular dangers or risks deriving from demolition of the system.
8
Manual manoeuvre for reversible models:
MB4605 - MB4615 - MB5615
In these models it is unnecessary to release the gear motor to open
the gate manually (make sure the electric lock is released): just push
hard on the end of the gate.
• check that the screw connections are perfectly tight;
• check that the lead nut and internally threaded screw are well
greased;
• check that the photocells are clean;
• after the above checks, block the gear motor and power the
control unit.
• MOBY does not have any torque adjustment devices; this kind of
adjustment is therefore made by the control unit.
• measure the force of impact as required by EN12453 and
EN12445 standards
Maintenance simply involves repeating the test procedure.
If waste sorting is required, the components should be grouped by
type of material (electrical, aluminium, plastic, etc.).
Tabla de contenido
loading

Tabla de contenido