Kurt D688 AngLock Manual De Instrucciones página 4

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Fig.1
Sketch #2A
Incorrect part
clamping.
Vise width
centerline
Sketch #2B
Correct part
clamping.
Sketch #2C
Correct part
clamping.
Sketch #2D
Correct part
clamping.
Non-
machined
spacer
6
ENGLISH |
Operating Instructions
Proper O-Ring installation and usage
Most jobs require a tight contact between the workpiece and the
parallels (see above). This option offered by Kurt Manufacturing
Company is ideal for that. The O-Ring installation will provide for the
movement needed when working with parallels.
Note: We do not recommend using this option with step jaws.
Installation: Install the O-Ring in the movable jaw as shown above in
two places. Tighten the adjustment set screw for a .002" space under
the front face of the movable jaw, then the jaw will tighten down
during clamping and provide down movement, pulling the part onto
the supporting parallel.
Proper Chip Guard installation and usage
CAUTION:
Chip Guard stock shown above is provided to keep chips
from the nut and screw assembly and must be cut and
deburred to meet your application and safety needs.
*This Chip Guard stock should be cutoff to fill the opening
between jaw plates.
Example: Part plus 1 1/2 inches = Length of Chip Guard stock.
Note: Remove Chip Guard stock to lift vise. Corners of Chip Guard
stock if left extended as shown above could cause injury.
Operating Instructions
| ENLGISH
7

Capítulos

Tabla de contenido
loading

Productos relacionados para Kurt D688 AngLock

Este manual también es adecuado para:

Anglock d688

Tabla de contenido