Skymsen PA-7 Manual De Instrucciones página 7

Ocultar thumbs Ver también para PA-7:
Idiomas disponibles

Idiomas disponibles

* Installation – make sure the installation followed item 2.1
instructions.
* Equipment life span: 2 years if normal working time is
performed.
1 – Each month check:
- Check the electrical installation
- Measure the voltage at the socket
- Measure the working current and match it with the
nominal current
- Check the tightening of all electric terminals to avoid bad
contacts
- Check electric motor shaft clearance
- Check the wiring for overeating, insulation failures and
mechanical damages.
2 – Each three month checks:
- Check electrical components such as ON/OFF switch,
emergency button, reset button, electronic electric circuits ,
overeating, insulation failings, or mechanical damages
- Check bearings clearances
- Check retainers, O'rings, V'rings and other seals
Use Your QR Code Reader to access
more information regarding safety and
maintenance.
7. PROBLEM SOLVING
The equipment has been designed to need minimum
maintenance, however, some performance failures may
happen due mainly to natural worn out, caused by the use
of the Processor.
If some problems arise with your Processor check Table - 04
below where there are detailed some possible solutions
7
loading