Munchkin Push to Close Gate Manual Del Usuario página 9

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

How To Install
3. Determine whether there is a stud behind the drywall where you will install the upper
catch wall bracket. Proceed to either 4a or 4b.
4a. For Drywall Without Stud / Plasterboard:
Drill a 7/32"(5.5mm) hole into the drywall at the
center mark. Insert a drywall anchor.
Use a screwdriver or drill to insert the screw through
the upper catch wall bracket into the drywall anchor.
Drywall
Large
Anchor
screw
4b. For Drywall with Stud:
Drill a 5/64"(2mm) pilot hole into the stud
(no anchor needed).
Use a screwdriver or drill to insert the screw through
the upper catch wall bracket into the stud.
Large
screw
16
B
B
ADJUSTING BOLT ADJUSTER
4a. Drywall
Check again that the center button on the upper and lower catch wall brackets are being
fully pressed in by the bolt adjuster. If so, use the wrench to firmly tighten the nut.
7/32"
(5.5 mm)
4a. Plasterboard
7/32"
(5.5 mm)
PLEASE NOTE: The gap between the gate to the wall should be less than 2.25" (57mm).
4b. Stud
5/64"
(2.0mm)
TOOLS NEEDED:
• Wrench
• Hex key
Upper catch
Lower catch
bracket
bracket
<2.25" (<57mm)
How To Install
<2.25" (<57mm)
17

Hide quick links:

Tabla de contenido
loading

Este manual también es adecuado para:

Mk0001

Tabla de contenido