VEVOR SSPDYBQ004 Instrucciones página 8

Red de barrera deportiva
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 80
STEP 4:A Schematic diagram of the effect after the installation to the
middle.
STEP5:The top rope ring is buckled on the top of the glass fiber
tube, the left and right operation.
- 7 -
loading