Operating Instructions - Project Source 67123W-6304 Instrucciones De Ensamblaje

Grifo de centro para baño
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

OPERATION INSTRUCTIONS
1.
Flushing and checking for leaks:
1
Important: After installation is complete, remove
the aerator (1) with a coin (2) to flush the water lines.
Turn on the water supply and allow both hot and cold
water to run for at least one minute each. This flushes
away any debris that could cause damage to internal
parts. While the water is running, check for leaks.
Turn off the water and replace the aerator.
1
2
7
Tabla de contenido
loading

Este manual también es adecuado para:

67123w-63700167123w-634408564941656678935667895

Tabla de contenido