Operating manual
To correctly install the unit, please follow the procedure described below:
1.Connect the load (i.e. PC CPU, Monitor) to the UPS Battery Protected outlets. Appropriate loads are
those units that will require extend run time during blackouts.
UK
2. Connect the selected load (i.e. printer, scanner) to the surge protected outlet. Appropriate loads are
those elements that demand surge protection, but that do not require extended runtime during
power outages.
3. If the UPS will provide communication to a computing system, connect the comms cable to the
UPS comm port and to the PC serial port