Installing Instructions - Cepra C 2VH-15 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTRUCTIONS PRIOR TO INSTALLATION:
Before starting installation please assure that:
- The technical features of the valve choosen are the adecuate ones for your installa-
tion.
- The pipes have been carefully flushed out to remove all residue that could damage
the valve, pump or any regulation device.
- There must be enough space, to remove the valve necessity.
- The valve is not installed upside- down, with the cover facing the ground (see insta-
lling instructions).
- The electrical voltage to be connected is the same as the voltage indicated on the
valve box.
- The main pressure and the differencial pressures do no exceed the maximum pressure
for correct valve opetarion (see technical characteristics).

INSTALLING INSTRUCTIONS:

m in 1 00 m m
17

Hide quick links:

Tabla de contenido
loading

Tabla de contenido