PTC HPP CLW HT Serie Instrucciones Para El Ensamblaje Y Mantenimiento página 25

Bombas de alta presión
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 40
b) Take out the valves (3), being careful not to damage
them.
c) Check the condition of the components and replace
any worn ones.
d) Reassemble the valves, and always replace the
O-rings (4) and (5).
CAUTION
• At every disassembly operation, always replace the O-rings.
SPECIAL MAINTENANCE – REMOVING THE PUMPING ELEMENT
In case of leakage, replace the pressure seals.
With regard to component numbering, refer to the exploded drawing in Fig. 4.
a) Fully loosen the screws (6) and carefully remove the
head (7).
EN
25
loading

Este manual también es adecuado para:

Clw 66/140 ht