REED PES4 Instrucciones De Uso página 2

Prensa de cierre a compresión para tubos de polietileno
Idiomas disponibles

Idiomas disponibles

CAPACITY: 2" - 4"
1. Follow all safety procedures.
2. Determine pipe/tube size and wall thickness
to be squeezed. Set stops for over-squeeze
protection.
3. Assemble tool handle where desired.
4. Insert ground probe into moist soil.
5. Unscrew the main pressure screw.
6. Lift and swing bottom bar.
7. Center the squeeze-off tool on and square to
pipe. This will allow pipe to flatten without
jamming pipe against tie rods.
8. Swing bar back over tie rods.
Reed Manufacturing Company
1425 West 8th Street
Erie, PA 16502 USA
Safety Considerations — Pressure control situations requiring
squeeze-off may involve working in the vicinity of escaping gas. Consider
the possibility and potential hazard of static electricity and observe
safety precautions. Safety precautions regarding static electricity generally
include performing squeeze-off in a separate bellhole remote from the
blowing gas; applying a wet rag/tape to the pipe surface; and spraying
area with a fine water mist to provide for the dissipation of static charge
to the ground — grounding the squeeze-off tool.* Check the squeeze-off
tool prior to use to assure it is the correct size; is properly functioning;
and is properly adjusted for the squeeze-off to be done.
*Consider using Reed's Grounding Accessory (#04619) and Static Discharge Alarm
(#04620).
Additional information on static electricity is available in the A.G.A. Plastic Pipe Manual
for Gas Service, Copyright 1989.
NOTE: Metric stops #98121 comply with ISO 4437.
9. Turn the feed screw to compress the pipe at
10. Squeeze the pipe only until flow is controlled or
Tool Removal
1. A release rate of 1/2 inch per minute or less
2. Rerounding the pipe can be done by rotating
3. Inspect squeezed section for damage before
PE Squeeze-Off Tool Instructions
a slow rate with momentary pauses to allow
stress relaxation in the pipe to occur. This is
particularly important when pipe is stiff in cold
weather.
bottom bar contacts over-squeeze protection
stops. Operation beyond this point may cause
damage to pipe or tool.
should be maintained to prevent damage to
pipe as recommended by ASTM F1041.
tool 90˚ and applying enough force to round
pipe.
covering. Procedures should be followed that
will prevent the same area to be squeezed-off
more than once.
Phone 814-452-3691 or 800-666-3691
Fax: 814-455-1697 or 800-456-1697
www.reedmfgco.com
PES4 Models
510-50492
loading