Palram Skylight Shed - 6x10 Manual De Instrucciones página 2

IMPORTANT
Please read
these
instructions carefully before you start to assemble this
shed.
Please
carry
out the
steps
in
the order
set
out
in
these instructions.
Keep these
instructions
in
a
safe
place
for future
reference.
Tools &
Equipment
j<2
T001
-
(supplied)
r
1
4
m
5/32"
(these items
not supplied)
Caulk/
Silicon
.afety
This shed
must
be
placed and fixed on
a
leveled surface to ensure
its
stability.
Make sure
that
screws and anchors are
compatible with
surface type.
Some parts have metal edges. Please be careful
when handling components.
Always wear gloves,
eye
protection,
and long sleeves when assembling or
performing
any maintenance on
your
shed.
Do
not attempt assembly
on days
with
strong winds or low temperatures.
If using
a
stepladder
or power tools ensure
that
you
follow
the manufacturer's safety advice.
Do
not
stand on the roof.
Do
not
store
hot
items
such
as
recently
used grills,
blowtorches
etc.
in
the
shed.
Heavy or sharp
articles should not
be
leaned against the wall panels.
To
prevent suffocation,
do
not allow children to
play
with
packing materials.
Shed
must
be secured by
drilling through floor
panels holes locations and inserting
suitable
screws
into ground
Before you
start
Rt
Consult your
local
authorities for
any
building limitations
or
permits required to
construct this garden
shed.
Rt
Complete
site
preparation before unpacking parts and beginning
assembly.
Rt
It
is
highly recommended to
be
assisted by
a
second person
in
some steps.
Rt
Sort
the parts and check against the contents parts
list.
Rt
Please
take safety precautions during assembly.
Durina Assembly
0
When
encountering the information
icon, please refer to the relevant
assembly step for additional comments and
assistance.
This
icon indicates
This
icon indicates
that
that the installer should
11
the installer should
be
be
inside the product.
outside the product.
InAttention:
Rt
It
is
important to drill the
screws at
the top of the
panel ridge and to
make sure
that
screws
penetrate through the
panel
in
order to
have
maximum durability.
Make sure
to position the
panel's
bottom
ridge towards the
shed
floor
and
that
it
is
enclosing
it.
Step
3: Place
the first wall panel at the back
of
the
shed,
according to the stamped
serial
number (part
7699).
Step 28:
Please
apply silicone
(caulk) sealant at
the connection between both
Aluminum
profiles (diagram
b), in
order to prevent water from seeping
in.
Step 43: Note
that
panels and profiles connected
in
the right direction
as
well
as
the profiles
holes placed
correctly
as
illustrated.
Step 50: Anchor the
shed on
to
a
solid surface
such
as
concrete or asphalt,
use
suitable
screws
and plugs.
(Screws
and plugs
are
not supplied).
*Please
note: Anchoring this product to the ground
is
essential to
its
stability
and
rigidity.
It
is
required to complete this stage
in
order for your warranty to
be
valid.
Do
not tighten
screws and nuts
(411
& 412)
until completion of
assembly
process.
These
2
icons
indicate if screws'tightening
is
required or not.
A
[
loading