Kostrzewa Mini Bio Luxury 12kW Manual De Uso página 70

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 177
10. Boiler operation and maintenance
70
CAUTION!
THE FLUE AND VENTILATION DUCTS REQUIRE PERIODICAL
INSPECTION AND CLEANING (AT LEAST ONCE A YEAR) BY AN
AUTHORISED COMPANY. AN EFFICIENT VENTILATION AND
FLUE SYSTEM IS REQUIRED FOR A CORRECT AND SAFE BOILER
(HEATING SYSTEM) OPERATION. THE MAINTENANCE AND
THE OPERATION OF THE FLUE DUCTS ARE COVERED BY THE
FOLLOWING REGULATIONS:
• THE ACT OF 24 AUGUST 1991 ON FIRE SAFETY (POLISH JOURNAL
OF LAWS NO. 81 AS AMENDED [DZ. U. NR 81])
• THE ACT OF 11 JUNE 2006 ON FIRE SAFETY OF BUILDINGS,
OTHER FACILITIES AND LAND (POLISH JOURNAL OF LAWS
NO. 80/06 [DZ.U. 80/06]).
Servicing and maintenance concerning:
1. Boiler and accessories wiring system
check the general condition of the wiring system in accordance with
good engineering practice
check cables, plugs and connections
check boiler control system connections and functions
check boiler pump and mixing valve operation
check operation of other devices in the boiler room (circulation pumps,
filters, sludge filters, valve etc.)
2. Storage hopper
Empty the storage hopper before maintenance and inspections.
check storage hopper for rigidity and leak tightness
check storage hopper top cover tightness
check storage hopper outlet for blockage
3. Final boiler room inspection
fill the storage hopper with fuel
start the boiler
check correct operation of the entire heating system
check (flue gas analysis) and adjust the heating system (control system
settings, burner settings etc.)
Leader in pellet boilers
Mini Bio Luxury 12; 21kW User Manual – EN 10.17
Tabla de contenido
loading

Este manual también es adecuado para:

Mini bio luxury 21kw

Tabla de contenido