Set Baud Rate
Select the baud rate by setting DIP switch position 8 (see below). The change will
take effect immediately.
Multi meter sys-
tem - Explana-
tion of symbols
18
Grid
supplies the loads in the system if insufficient power is being gen-
erated by the PV modules or supplied by the battery.
Inverter in the system
e.g. Fronius Primo, Fronius Symo, etc.
Fronius Smart Meter
measures the metering data relevant for the billing of electricity
quantities (primarily the kilowatt hours of grid purchases and grid
power feed). On the basis of the data relevant for billing, the elec-
tricity retailer invoices a grid purchase and the purchaser of the
surplus pays for the grid power feed.
Primary meter
records the load curve of the system and makes the measured
data available for energy profiling in Fronius Solar.web. The
primary meter also regulates the dynamic feed-in control.
Secondary meter
records the load curve of individual loads (e.g. washing machine,
lights, television, heat pump, etc.) in the consumption branch and
makes the measured data available for energy profiling in Fronius
Solar.web.
Baud Rate
DIP Switch 8
9600 (default)
0 (OFF)
38400
1 (ON)