CLIVET ELFORoom2 3 Manual De Instalacion Y Uso página 53

Terminale ad acqua
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 134
3.4 INSTALLATION
The following descriptions of the various mounting phase and the relative designs refer to a version of the machine with fixtures on the
left. The operations for the mounting of machines with fixtures on the right are exactly the same
Only the images are to be considered as a mirror image.
3.5 SIDE OPENING
lift A
unscrew B
move to the left C
lift C
3.6 HORIZONTAL OR CEILING INSTALLATION
Using the paper template, trace on the ceiling the position of the two fixing brackets and the two rear screws.
Using a suitable drill, make the holes and insert the toggle bolts (2 for each bracket) (fig. 3.1 ref. A); fix the two brackets (fig. 3.1
ref. B). Do not over-tighten the screws.
Position the machine on the two brackets, keeping it in position and then fix the two screws into the rear toggle bolts (fig. 3.1 ref.
C), one on each side.
Make sure that there is sufficient inclination of the unit towards the drainage pipe to facilitate the water drainage (fig. 3.1 ref. D).
Fully tighten all 6 fixing screws.
fig 3.1
3 - POSITIONING
.
lift A
unscrew B
move to the right D
lift D
53
Tabla de contenido
loading

Este manual también es adecuado para:

Elforoom2 5Elforoom2 11Elforoom2 15Elforoom2 17

Tabla de contenido