JF 1000 AT Manual De Instrucciones página 62

Cabezal de área total
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

P
R
R
18
Operation Technical Manual
P
7.
8.
R
S
9.
V
T
10.
S
Remove the 4 bolts (P) and remove the
bearing assembly (R).
Remove the bearing (R) of the box.
Remove the two pins (S) and remove the
shaft (T).
Replace the minor shaft (T) by the major shaft
(V) supplied with the platform.

Capítulos

Tabla de contenido
loading

Tabla de contenido