Pfister R89 808 Serie Instrucciones De Montaje página 3

Idiomas disponibles

Idiomas disponibles

7
7A
7G
7D
7C
7E
7 TRIM FLANGE ATTACHMENT
Position Flange (7A) on Valve (7B) with Drain Hole (7C) at the bottom. Place
Protective Washer (7D) on the short end of the reversible Retainer Sleeve (7E).
Screw Retainer Sleeve (7E) onto threaded section of the Stem and Bonnet (7G).
Tighten Retainer Sleeve (7E) by hand until Flange (7A) is snug to finished wall
surface. If the short end of the Retainer Sleeve (7E) is too short, reverse it to
use the longer end.
8
8A
8D
8C
8E
8 HANDLE ATTACHMENT
Screw Stem Extender (8A) onto Valve Stem (8B). Thread Set Screw (8C) into
Handle (8D) and thread it in only three to four turns. Place Handle (8D) onto
Stem Extender (8A) and tighten Set Screw (8C) by using Hex Wrench (8E) that
is provided.
Make sure Set Screw (8C) is securely tightened to handle (8D).
7B
7C
8B
ENGLISH
9
Allow a minimum of 8"
clearance between the
center of shower hole and
ceiling.
9 SHOWER ARM INSTALLATION
Insert the end of Shower Arm (9A) through the Shower Flange (9B). Apply PTFE
plumber's tape to both ends of Shower Arm (9A) according to manufacturer's
instructions. Screw the end of Shower Arm (9A) into pipe elbow inside the wall.
Slide Shower Flange (9B) tight to the wall and tighten set screw (9C).
10
10B
10 SPOUT INSTALLATION
Apply PTFE plumbers tape on both ends of Pipe Nipple (10A) (not included).
Screw Pipe Nipple (10A) into the elbow inside the wall and tighten with pipe
wrench. The Pipe Nipple (10A) is to project 3
Screw Tub Spout (10B) onto Pipe Nipple (10A) and tighten until Spout is properly
positioned and flush to the finished wall.
11 UNIT START UP
Turn on hot and cold water supplies, and check all connections for leaks.
3
9C
9B
9A
10A
/
" to 4 "
3
7
8
/
" to 4" from the finished wall.
7
8
loading

Este manual también es adecuado para:

G89 808 serie