Qlima R4224TC Instrucciones De Uso página 75

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 40
5/16"
STEP 17
STEP 19
STEP 21
STEP 23
STEP 25
STEP 27
STEP 16
STEP 18
STEP 20
STEP 20
STEP 22
STEP 3
STEP 26
15. Reposition 4 wing nuts on the mounting stud, but do
not tighthen them.
16. Raise the wick to its highest position and tighten the
wing nuts in several steps.
17. Check the wick height. It should be 5/16 inch above the
collar.
18. Check for the correct clearance between wick holder
and draft tube. It should be the same all around.
19. Reinstall the tip-over switch assembly by pushing the
extinguish knob .
20. Check the function of the tip-over safety stop by push-
ing the extinguish button  to activate the pendulum.
21. Reinstall the automatic ignition assembly.
22. Reinstall the wind cover A / B.
23. Reinstall the ignitor coil K.
24. Reinstall the cabinet .
25. Tighten the 5 screws on the cabinet and reinstall the
sensor at the back of the cabinet .
26. Reinstall the combustion chamber 4 and the fuel tank
.
27. Reinstall the knurled wick adjustment knob 2. Close
the front plate.
Install the batteries in the battery case and fill the fuel tank
with Premium Quality Fuels. Put the tank into the heater
and wait at least 30 minutes for the new wick to fully satu-
rate with the fuel.
4
75
loading

Este manual también es adecuado para:

R7227tc