GE AEV24 Serie Manual Del Propietario E Instrucciones De Instalación página 13

Idiomas disponibles

Idiomas disponibles

Window Installation Instructions
6
INSTALL THE CASE
IN THE WINDOW
Use a wood block (obtained locally) between
D
the leveling bolts and the wall if the wall is
weak or if the weight of the air conditioner
falls between the studs in the wall.
Adjust the leveling bolts and nuts against the
E
outside wall so that the case has a slight tilt
to the outside. Tighten nuts with an adjustable
wrench. Use a level; no more than a 1/2 bubble
will be the correct case slant to the outside.
Extend the left and right accordion panels
F
to the vertical window sashes. Drill pilot
holes and attach the top and bottom corners
with 4 type D screws.
Top mounting rail
Type D
screw
Type D
screw
(cont.)
Type D
screw
Type D
screw
7
INSTALL SUPPORT BRACKETS
AND THE FOAM TOP WINDOW
GASKET
Drill pilot holes and attach the support
A
brackets with two type D screws, one on
each side.
Cut the foam top window gasket to the
B
window width.
Stuff the foam between the glass and the
C
window to prevent air and insects from
getting into the room.
13
loading

Este manual también es adecuado para:

Aeq24 serieAeh24 serieAew24 serieAew24dkAeh24dk