Perel BG58000V2 Manual Del Usuario página 3

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 11
5.
Installation
1.
Measure the actual hole distance according to the back plate.
2.
Drill the holes accordingly (depth 70 mm, Ø 12 mm).
3.
Fix an anchor inside each hole and use a spanner to fasten the drop box.
6.
Cleaning and Maintenance
Occasionally wipe with a damp cloth to keep it looking new. Do not use harsh chemicals,
cleaning solvents or strong detergents.
V. 01 – 14/09/2022
BG58000V2
3
©Velleman Group nv
loading