hour meter reading appears on the display and the timer countdown begins. If an error has been
made while decreasing the hour meter reading, for example, the hour meter can be reset to 9,000 by
holding the switch for 5 seconds. The hour meter reading is then reset to 9,000 and a new value can
be set.
The hour meter indicates that the lamp must be replaced as follows:
•
From hour meter reading 0672 the display flashes each second. The lamp should be replaced within
4 weeks.
•
From hour meter reading 0336 the display flashes each half second. The lamp should be replaced
within 2 weeks.
•
From hour meter reading 0168 the display flashes each second. The lamp should be replaced within
1 week.
•
When the hour meter reading reaches 0000, the numbers will flash quickly and the counter will no
longer count down. The lamp must be replaced.
DISASSEMBLY/MAINTENANCE
Always disconnect the power supply during maintenance/disassembly of the device.
The device must be cleaned at least twice a year. When there is a significant amount of algal growth and/
or lime build-up in the unit the quartz sleeve (M) must be cleaned.
The special lamp must be replaced after the number of hours of operation has elapsed. The inside of the
reactor can be cleaned with a soft brush.
1. Let the water flow out of the device.
2. Unscrew the nut (N) and remove the lamp (K) from the fitting (L). Remove the lamp from the quartz
sleeve, and replace the special lamp (K) if necessary. Caution is advised as these are very delicate parts.
3. Carefully remove the quartz sleeve (M) (see figure 3). Never use force! CAUTION: Always wear
protective gloves and glasses.
4. Clean the quartz sleeve with an appropriate cleanser. Always use a soft cloth to clean the sleeve and
avoid scratches.
5. Place the quartz glass (M) (drawing 3) back in the reactor (U). Never force! CAUTION: always wear safety
gloves and glasses.
6. Carefully place the lamp back in the quartz sleeve (M), fit the O-ring (P) back onto the quartz sleeve
and connect the lamp (K) to the fitting (L). Screw the nut (N) back onto the housing.
If the housing or the electrical section must be replaced, the earthing must first be disconnected from the
housing. Please read the Installation and Disassembly section before installing a new housing or electrical
section. Make sure you save the various separate parts for the earth connection. These are not supplied
with a new housing or electrical section. If in doubt about the connection, consult a qualified installer.
For the safety instructions and terms of guarantee we would like to
refer to the general UV-C manual from VGE International B.V.
UV-C and Pool equipment
TIMER UV-C |
11
EN