PF Jones 29500572PF Instrucciones De Montaje página 15

Set up trailer operation
CITROËN
The activation of
• trailer indicator monitoring
• PDC deactivation
has to be carried out using the CITROËN Proxia-Tester as follows:
• remote loading / remote coding
• installation / de-installation
• selection vehicle type
• trailer control unit (BSR)
• installation of equipment
FIAT
The activation of the trailer indicator monitoring and cutoff of the vehicle's PDC must be carried out with the aid of the FIAT
EXAMINER tester as follows:
Module programming
• Test the controllers
• Select the type of vehicle
• Group SAFETY
• System BODY COMPUTER
• Active diagnosis
• Configuration
• Manual configuration of the system
• Continue to subgroup EXECUTION
• Set trailer controller to present
PEUGEOT / TOYOTA
The activation of the trailer indicator monitoring and cutoff of the vehicle's PDC must be carried out with the aid of the DIAGBOX
tester as follows:
• choose vehicle
• delivery
• equipment
• trailer control unit (BSR)
• installation of equipment
47
87502402/17.11.2021
PF Jones Ltd, Nuttall street, Old Trafford, Manchester, M16 9JA / Tel- 0161 872 4755 / email- [email protected] / web- www.pfjones.co.uk
loading