universalblue UAS1906-21 Manual De Instrucciones página 60

Idiomas disponibles

Idiomas disponibles

Post-installation checks
1.Check that the screws are correctly tightened and there is no risk
of them coming loose.
2.Check the connector of the display board.
3.Check that the control box cover is properly tightened.
OUTDOOR UNIT INSTALLATION
Installation diagram
60
loading

Este manual también es adecuado para:

Uas1909-21Uas1912-21Uas1915-21