Zenna Home 2156SS Instrucciones De Montaje página 5

STEP 3
NOTE: ASSEMBLY SHOWN FOR 96 IN. OPENING HEIGHT. The following assembly
should be modified based on your opening height, SEE CHART ON PAGE 4.
1. Place a wedge (J) (tapered or rounded end up) on a long tapered tube (C)
approximately half way down.
2. Slide a wire shelf (I) down the tube and fit over the wedge (J) and repeat the process
for another wire shelf (I)
3. Repeat this step for the medium tapered tube (D) and the other wire shelves (I).
NOTE: Shelves can be adjusted by moving the wedges (J) up or down.
Pg 5 of 20
I
J
I
J
C
1-800-892-3986
IS2157
loading

Este manual también es adecuado para:

E2156ss2156wwE2156ww