BIR 01- _ _ _ _ -K12LL3-000S04
Inductive Rapid Positioning System
Display elements
Balluff Standard
Signal
Meaning
Blue flashing, 3 Hz
The Device Discovery can be
activated via a system command
to find the device again.
Red flashing, 3 Hz
Short circuit at pin 2 or pin 4
Red flashing, 1 Hz
This signal occurs if a
measurement error occurs. The
measurement value is unknown
due to an error or outside of the
measuring range.
Red, static
General error
Red, static
The device is currently in teach-in
mode
Blue, static
Maintenance must be performed.
Orange flashing,
Overload on pin 2 / pin 4 has been
3 Hz
detected.
Yellow flashing,
The device is operated outside of
3 Hz
specifications. A reliable
measurement signal can no longer
be ensured.
Green, alternating
IO-Link communication is active.
with LED off in a
The device is ready.
ratio of 10:1, 1 s
period
Green, static
The device is ready
Cable routing
Defined ground!
The BIR and the control cabinet must be on the
same ground potential.
Shielding
Observe the following instructions to ensure
electromagnetic compatibility (EMC):
–
Connect BIR and controller using a shielded cable.
–
Shielding: Braided copper shield with minimum 85%
coverage.
–
Shield is internally connected to connector housing.
Cable routing
Do not route the cable between the BIR, controller, and
power supply near high voltage cables (inductive stray
noise is possible). The cable must be routed tension-free.
Cable length
For IO-Link operation, the maximum cable length is 20 m.
www.balluff.com
Namur Standard
Signal
Meaning
Blue flashing, 3 Hz
The Device Discovery can be
activated via a system command
to find the device again.
Red flashing, 3 Hz
Short circuit at pin 2 or pin 4
Red flashing, 1 Hz
This signal occurs if a
measurement error occurs. The
measurement value is unknown
due to an error or outside of the
measuring range.
Red, static
General error
Red, static
The device is currently in teach-in
mode
Blue, static
Maintenance must be performed.
Orange flashing,
Overload on pin 2 / pin 4 has been
3 Hz
detected.
Yellow flashing,
The device is operated outside of
3 Hz
specifications. A reliable
measurement signal can no longer
be ensured.
Green, alternating
IO-Link communication is active.
with LED off in a
The device is ready.
ratio of 10:1,
1 period
Green, static
The device is ready. Diagnosis
functions are on.
Static white
The device is ready. Diagnosis
functions are switched off.
Electrical Connection
The electrical connection is made using a connector.
Pin
Signal
1
18...30 V
2
Not assigned
1)
3
GND
4
C/Q (communication
line)
1) Reference potential for supply
voltage and EMC-GND
3
4
2
1
Pin assignment of S04
(view from above on BIR)
english
3