Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

H-9401
MODULAR
SPILL BERM
1. Clean surface where unit will be installed. Remove
any debris or build-up of grease/oil from the floor.
WARNING! Not properly cleaning the surface
may result in failure of the floor sealant.
2. Caulk any cracks or separations on the floor that the
unit will cover.
3. Lay out the pieces to determine if any straight
sections need to be cut to fit the size of containment
area. Cut using a utility knife with a straight edge.
4. Apply the sealant to bottom of straight and corner
sections. The sealant should be applied 1" in from
the outer edges in a continuous line to ensure a
complete seal. (See Figure 1)
NOTE: For better adhesion, scuff the bottom
of the straight and corner sections with
sandpaper.
• If product is rolled up for storage, let it lie flat for two hours before installation.
• Let sealant and glue dry for at least one hour before use.
• To remove unit, scrape with a flat-blade shovel and use silicone remover to clean caulking from base.
PAGE 1 OF 3
1-800-295-5510
uline.com
INSTALLATION
Figure 1
CARE INSTRUCTIONS
5. Place the straight and corner sections on desired
area of floor and apply pressure.
NOTE: To ensure proper sealing on uneven
surfaces, applying extra sealant and more
direct pressure may be needed.
6. Apply the vinyl adhesive to join corners and straight
sections.
a. Attach corners: Apply vinyl adhesive to built-in
vinyl cover on corner section and end of straight
section. Attach the two pieces and apply
pressure (approximately 30 seconds).
(See Figure 2)
Figure 2
b. Add straight sections: Align the two straight
sections. Apply the connector vinyl over the top
and cut to length. Seal with vinyl adhesive and
apply pressure (approximately 30 seconds).
Para Español, vea página 2.
Pour le français, consulter la page 3.
1220 IH-9401
loading

Resumen de contenidos para Uline H-9401

  • Página 1 Para Español, vea página 2. Pour le français, consulter la page 3. H-9401 1-800-295-5510 uline.com MODULAR SPILL BERM INSTALLATION 1. Clean surface where unit will be installed. Remove 5. Place the straight and corner sections on desired any debris or build-up of grease/oil from the floor.
  • Página 2 H-9401 800-295-5510 uline.mx BERMA PARA CONTENCIÓN DE DERRAMES INSTALACIÓN Limpie la superficie donde instalará la unidad. 5. Coloque las secciones rectas y de las esquinas en Retire cualquier desecho o acumulación de aceite el área del piso designada y haga presión.
  • Página 3 H-9401 1-800-295-5510 uline.ca BERME DE DÉVERSEMENT MODULAIRE INSTALLATION Nettoyez la surface où l'article sera installé. Enlevez 5. Placez les sections droites et de coins sur la zone du tout débris ou accumulation de graisse/huile du sol. sol souhaitée et exercez de la pression.