AENO VS1 Manual Del Usuario página 10

Ocultar thumbs Ver también para VS1:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 35
6. Press the "Vac Seal" button (4) on the unit twice. The indicator (6) on the
control panel will light blue, which means that the air pumping process has
started.
7. When the vacuuming is finished, the device will turn off automatically, the
indicator on the control panel will go out.
8. Turn the "Releasing Valve" (2) to release air.
9. Disconnect the adapter and close the container (bag) outlet valve.
Interrupting the vacuuming and/or sealing process
When working with some products, it is recommended to control the intensity
of air pumping in order not to spoil the appearance of the products. To
interrupt the vacuuming and/or sealing process at any time press "Seal" (5) or
"Vac Seal" (4).
Note. Wait at least 60 seconds between starting the sealing process to allow
the heating element to cool down.
Troubleshooting
 There were pieces of the package left on the welding strip after sealing.
Possible cause: overheating of the welding strip. Solution: Allow the device
to cool for 90 seconds.
 After sealing, air appears in the bag. Possible cause: puncture of the bag by
the sharp edges of protruding products. Solution: Replace the bag, remove
products with sharp edges, or cover the edges of the products with a cloth
or suitable cloth.
 The sealing seam is tenuous. Possible reason: insufficient sealing time.
Solution: Repeat the sealing process again, following all the points in the
instructions.
10
aeno.com/documents
loading

Este manual también es adecuado para:

Avs0001