Connecting The Condensation Hood With The Unit - Rational UltraVent Plus Manual De Instalación Original

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 39
en
6. Break out one of the holes on the floor
in the rear area of the condensation
hood.
7. Feed the bus cable through the hole in
the floor of the condensation hood
[
Photo
30].
8. Secure the cable connection of the bus
cable in the hole.
9. Secure the cover with the 4 screws to
rear side on the right [
10. Slide the electronics module back into
the condensation hood on the front
and attach the module with 4 screws
[
Photo
27]. Make sure the fit of the
seal is correct.
11. Insert the cover in the electrical com-
partment [
Photo
12. Insert the right and left impact filters
[
Photo
15]. To secure the impact
filter, pull the locking latch on the left
of the impact filter to the left
Connecting the bus cable in the bottom
unit
a
The additional bus cable is connected
to the control board of the condensa-
tion hood.
1. Guide the bus cable from the condens-
ation hood to the lower unit.
2. Remove the left side panel of the
lower unit.
3. Break out one of the holes above the
media outlets on the rear side of the
bottom unit [
4. Feed the bus cable with the protective
conductor through the hole. Secure the
cable connection in the hole
[
Photo
22].
24 / 160
Photo
33].
14].
Photo
21].
80.51.570_iCombi Pro-iCombi Classic_UV P_IM_V01_EU-west
5. Guide the bus cable in the unit to the
fan motor [
Photo
unit in such a way that it is not affected
by heat sources. Observe the cable
routing for the respective unit size:
Unit
Handling the bus cable...
size
6-1/1
Pass the steam generator and go
 / 6-2/
directly to the fan motor
1
10-1/1
Between the steam generator and
 / 10-2
lower fan motor over to the upper
/1
fan motor
1. Disconnect the dummy plug from the
top fan motor of the lower unit and
connect the bus cable from the con-
densation hood [
2. Check the cable routing to the fan mo-
tor. If there is still any cable length re-
maining, pull the bus cable straight and
secure the rest of the cable in the elec-
trical compartment with a cable tie.
Screw the cable connection.
3. Fix the cable to the rear side of the unit
with the self-adhesive cable holders
supplied.
4. Connect this protective conductor to
the steam generator housing with the
ground connection [
5. Mount the left side panel of the unit.
Connect the condensation hood with the
units (see
} Connecting the condensation
hood with the
unit).
5.2.4 Connecting the condensation hood
with the unit
a
The condensation hood is installed.
a
The bus cable is connected in the unit.
a
The condensation hood is connected
to the power supply.
5 | Installation
31]. Guide the
Photo
24].
Photo
25].
Tabla de contenido
loading

Este manual también es adecuado para:

Ultravent 6-1/1 elettrico 60.75.134Ultravent 10-1/1 elettrico 60.75.134Ultravent 6-2/1 elettrico 60.75.135Ultravent 10-2/1 elettrico 60.75.135Ultravent 6-1/1 elettrico 60.75.138Ultravent 10-1/1 elettrico 60.75.138 ... Mostrar todo

Tabla de contenido