Step 2B Solid Concrete Wall Option
WARNING:
Do not use a drill for tightening the lag screws! Only use a socket wrench.
e5qvDfq/!h/vSpf!X4qhSpvhy6X3qXfXqf!X/3DSbS,! uaurq5!
4PX!24KeOrv,w/!h/w!pS,4PX!24KeOv4f6pp!D‰ X bp3S,Svh4
Eh46X!/w!2SppfpS/!v44!P6X!p3gS4/!h!D/q/w!2SppG!gqX!
ing to the next step.
Wq6h//w!2SppfpS/!DvX!P/p3qh/q/w!PqhPX!/!46XgSP!2v/wq 6/
any covering.
15wH50.NBwxxkbH5w.kB.WwHw6@,,#IxHwO.wwc0B##
2B-1
2B-2
Wall Thickness
ƒ vh
(140mm)
Position the wall plate Hw#y,@HwpT
at your desired height. Level the
wall plate Hw#y,@HwpT and mark
the pilot hole locations.
04
11
X/v,w/!h/w!pS,
//w!2SppfpS/!
Pqh/vh6 -
Level
(Not Included)
Drill 4 pilot holes using a 3/8
in (10mm) diameter drill bit.
Make sure the depth is not
less than 3 in (75mm).
Electric Drill
(Not Included)
Wall
Anchor
A2
Pencil
(Not Included)
3 in (75mm)
3/8 in (10mm)