Tools Required for Woodbox Installation:
Safety Goggles
Ear Protection
Dust Mask
Gloves
Shovels (digging & flat)
Metal Cutters for banding on cubes
Mason Hammer (chipping, hammer)
Road Stone Rake
Tamper (Hand or Mechanical)
Wheelbarrow
Level (2' and 6' recommended)
Speed Square
Caulk Gun 10 oz or 28 oz (depends on what size
adhesive is purchased)
Rubber Mallet
14" Demo saw with diamond blade
Tape Measure
Marking Device (pencil, soap stone, etc)
Chalk Line
Hand Broom
Concrete Tools (Trowel/Floats)
2 Carpenter Clamps
Drill & 1/16" bit
5/16" nut driver
7 ¼" Circular saw with wood blade
4" Electric grinder
4" Diamond cup grinder
Items Included in the Woodbox Kit:
2 - Reinforced concrete lintels 32" x 4" x 8"
3 - Plastic shim pack sheet for leveling lintels or
block as needed
Imported polished granite tile for facing front of
fireplace (4"x12" and 4"x8" tiles)
1 - Cube of Cambridge Olde English Wall
1 - Installation manual for concrete pad and Olde
English Wall
All manuals and user guides at all-guides.com
Cambridge Pre-Packaged / Pre-Cut
Olde English Wall Firewood Box (Left Hand)
Material Required:
¾" clean stone (approx. 1/4 ton)
Concrete (approx. 9-80 lb bags)
Cambridge concrete adhesive (approx. 2-29 oz.
or 6-10.3 oz. tubes)
(4 pcs) 2" x 4" x 8' lumber
2 ½" wood screws
½" rebar (approx. 8')
2
2011