Operation - Blumfeldt Wasserwerk 250 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

OPERATION

Once the pump is installed and connected, allow it to spend at least 8 hours in
full sunlight before using it.
Testing The Control Box:
Press ON and make sure that the corresponding LED starts to light up.
Press MODE several times to cycle through the different operating modes,
which are indicated by changing LEDs (solar operation, battery operation).
As soon as the solar panel is connected to the control box, the charging
LED should light up to indicate the charging status.
On
Off
low
high
Water flow
Solar
operation
Battery operation
Recharge
Low battery
LED
Pump
LED
Mode
EN
17
Tabla de contenido
loading

Este manual también es adecuado para:

1002990110029902

Tabla de contenido