HOPPER PREPARATION
Fig 1
• Install the feeder tube connection (O) on the hopper body (on
the side where the boiler will be positioned), securing it with 4
M6 screws.
BOILER PREPARATION
Fig 2 - 3
• Remove the pre-cut lidon the back of the boiler (Pic. 2), un-
screw the fastening screws of the closing flange located under
the pre-cut lid and replace it with a flexible pipe connection
flange (M-Pic. 3).
Fig 4
• Connect the flexible tube (N) to the conveyor tube (I) and
to the flexible tube connection flange (M), and secure it using
cable ties (supplied).
Note: the flexible pipe (N) must be positioned so that it car-
ries the pellets to the hopper without causing bottlenecks;
check this during the first few loads and seal any powder
leaks with silicone.
INSTALLATION
Fig. 1
Fig. 2
Fig. 3
Fig. 4
- 10
-
O
N
M
M
I