Pre-Assembly; Tools And Materials Required; Hardware Included; Package Contents - Home Decorators Collection BRUNFIELD BUGVT6122 Guía De Uso Y Mantenimiento

Tocador de pared
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Pre-Assembly

PLANNING INSTALLATION
The vanity is heavy. For a secure installation, THREE people are recommended. A plywood support board must be installed behind the vanity,
spanning at least THREE vertical wall studs. To do so, it may be necessary to cut out the drywall so that the board can be attached to the studs.
Each metal mounting bracket (AA) must be screwed into at least TWO 2 x 4 wall studs and secured within 4" of each end of the bracket.
In the event 2 x 4 studs cannot be located within this area, additional bracing must be installed behind the nished wall as follows.
Position the board between the studs so that the front surface of the bracket is ush with the front of the studs. The nished wall is then
applied over the board. Vanities installed without plywood support will void manufacturer warranty.

TOOLS AND MATERIALS REQUIRED

Carpenter
level
Wood
screws

HARDWARE INCLUDED

NOTE: Hardware not shown to actual size.
AA
Part
Description
AA
Mounting bracket
BB
Short screw

PACKAGE CONTENTS

Pencil
Phillips
Screwdriver
CC
BB
Quantity
A
Part
Description
A
Vanity
B
Basin
C
Shelf
Stud
nder
Drill
DD
Part
2
CC
14
DD
B
3
Dry wall
saw
Silicone
sealant
Description
Long screw
Shelf pin
Quantity
1
2
2
HOMEDEPOT.COM/HomeDecorators
Please contact 1-800-986-3460 for further assistance.
Plywood
support board
Clean
rag
Quantity
8
8
C

Capítulos

Tabla de contenido
loading

Tabla de contenido