3. Adjust the deck-height-adjustment lever to the lowest cutting height position.
4. Disconnect three blade motor cables (Fig.1a).
5. Place a rug or a mat (similar in size to that of the deck) under the deck to prevent the damage to the deck.
6. Remove the cotter pins and push the shaft pins out. Save both sets for deck re-assembly (Fig. 1a & b & c).
7. Push the deck forward (towards the front wheels) and rotate the suspension linkage counterclockwise to release it
from the deck hooks (Fig. 1a).
1a
Suspension Linkage
1b
Cotter Pin
3
Right side
Motor Cable
1c
2
1
Cotter Pin
Left side
GRASS BAGGER KIT — ABK5200
Cotter Pin
7