veNT TeRmINATION CleARANCeS
CleARANCe
Clearance below or beside any door or
feet
window that opens.
Clearance above any door or window that
1 foot
opens.
feet
Clearance from any adjacent building.
Clearance from any adjacent public
feet
walkways.
Clearance above any grass, plants, or other
feet
combustible materials.
Clearance from any forced air intake of any
feet
appliance.
feet
Clearance below eaves or overhang.
Clearance horizontally from combustible
1 foot
wall.
feet
Clearance above the roof.
Clearance above the highest point on the roof
feet
within 10 feet.
wall
Termination
fresh Air
Inlet
heat resistant
material
Figure 8: Straight Installation--outside, through wall installation
1
floor
Check for parts online at www.castlestoves.com or call 800-345-6007 M-F 8-5 CST
INTAke & exhAuST pOSITIONS
Figure 7: Intake and exhaust positions
Termination
venting pipe
wall
fresh Air
Inlet
floor
Figure 9: Straight Installation—inside vertical rise, horizontal
termination
Operator's Manual
HPS10 Pellet Stove
heat resistant
material