Storage And Transportation - BEG HS1090 Manual De Instrucciones

Elevador de material
Tabla de contenido
4.3 Inspection after assembly
The functionality of the product must be inspected after the assembly work has been
completed.
In particular, check:
- Whether all intended assembly work has been completely and properly carried out
- Whether all screw connections have been correctly screwed together
- Whether all materials have been completely installed
Use the checklist under point 6.4 for the inspection
An acceptance test must be conducted before first use!
- The product may only be used in a faultless condition
- The acceptance inspection must be documented in writing

5. Storage and transportation

5.1 Storage
- The product must not be stored in damp or wet environments. In order to protect the feet, it
is preferable to store the product lying down
5.2 Transportation
- In order to transport the product, all of the (screwed together) components must be
tightly connected to one another.
- There must be no loose parts on the equipment
- The equipment may only be moved manually.
6. Cleaning/maintenance/repair/periodic inspections
6.1 Cleaning
WARNING! Caution: risk of slipping! Life-threatening accidents can be
caused due to residual water on the steps! Please observe the safety
instructions, particularly points 2.3 and 2.6
-
Cleaning agent residues and/or water on the steps must be immediately removed
because they present a serious risk of slipping.
-
The product can be cleaned using water together with commercially available cleaning
agents
-
The equipment must be dried to avoid corrosion
EN
Tabla de contenido
loading

Este manual también es adecuado para:

Hs1590Hs-k1590Hs3011Hs3015

Tabla de contenido