Parts List
Tools Needed: Phillips head screwdriver
Basket Parts
A
B
C
D
E
F
A
Bedding
NOTE: The
manufacturing
B
Storage Skirt
date code is
underneath
C
Pad
Basket Board.
D
Sheet
E
Metal Side Rails (with foam tops) (2)
F
Basket Board
G
Metal Basket Ends (with plastic housing) (2)
Basket Hardware
H
To Assemble Basket
1
Metal Side Rails:
Locate two Metal Basket Ends.
Position with knobs out (Figure 1).
Position two Metal Side Rails
with foam on top. Secure one
Metal Basket End to Metal Side
Rails using four screws. Repeat
on other Metal Basket End
(Figure 1a).
Screw (8)
H
Screw (4)
G
1
Knobs Face Out
Wood Frame Parts
I
Bushing
Shoulder
(4)
Bolt (2)
Sound Module
Mounting
Screw (2)
T-Nut (8)
Bolt (8)
J
K
I
Hardware
J
Casters (2 with locks)
K
Music Module
Slide Locks (2)
L
Headboard (2)
M
Storage Board
N
Bottom Rail Assembly
O
P
Rail (2)
1a
Foam Up
2
Barrel Nut
(2)
Wood
Dowel (8)
L
Screw (8)
M
N
O
P