Uline H-4281 Manual Del Usuario página 2

Paneles de rejilla con patas en t
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Figure 2
PAGE 2 OF 6
ASSEMBLY CONTINUED
2. Line one T-Leg up with the side of the gridwall panel
so that the holes face the 1st and 6th open squares.
(See Figure 2)
3. Push one screw through each hole in T-Leg and
double wires in gridwall panel. From the inside of the
panel attach washers and nuts. (See Figure 2)
4. Repeat on opposite side with second T-Leg.
5. Repeat all steps to assemble second unit.
1-800-295-5510
uline.com
NOTE: Gridwall panels have double wires on
vertical sides.
NOTE: If unit is not level once completely
assembled, adjust levelers by twisting
clockwise or counter-clockwise to either
increase or decrease height.
0421 IH-4281
Tabla de contenido
loading

Tabla de contenido