FIGURE 2
TOP TRAY
TOP TRAY FRAME
HANDLE
Step 2: Insert top tray and frame into the handle (as
shown in Figure 2).
FIGURE 4
Step 4: Make sure that the unit will slide in-and-out
without any interference. Adjust the upright to the
left or right side, if necessary, and proceed by
tightening the caddy upright screws in the front and
rear of the unit. (as shown in Figure 4). (Note: The unit
is more balanced if upright is centered.)
All manuals and user guides at all-guides.com
FIGURE 3
Step 3: Place assembled unit in the slide system (as
shown in Figure 3), and place inside the cabinet.
FIGURE 5
MOUNTING SCREWS
Step 5: Pull the caddy out of the slides about 2" and
fasten rear mounting strap to the cabinet floor with
mounting screws provided. Remove the caddy from
the frame and then attach the front mounting strap to
the cabinet floor (as shown in Figure 5).
La canasta del fregadero debe ser instalada en el lado del gabinete que tiene la menor cantidad de
obstrucciones (por ejemplo, plomería o un triturador).
Votre panier pour évier doit être installé sur le côté du caisson qui a le moins d'encombrement (dû à la
robinetterie ou au vide déchet par exemple)
Piezas incluidas:
Cesta inferior
Panier inférieur
Bandeja Superior
Tablette du Dessus
Marco superior
Armature supérieure
FIGURA 1
FIGURE 1
M4 x 12mm
Instrucciones de Instalación 544-10C
Instructions d'installation 544-10C
Pièces incluses:
Tornillos de montaje
Sistema que resbala
Vis de Montage
Système qui glisse
Tornillos de máquina
Vis de machine
Carrito
Chariot
Paso 1: Sujete la canasta en sentido vertical en el
centro de la canasta inferior y apriete libremente los
tornillos M4 x 12mm (como se muestra en la Figura 1).
Etape 1: Attacher le panier verticalement au milieu
du panier du bas et serrer, sans les fixer
définitivement, les vis M4 x 12mm (voir Figure 1).